Calypso Bay Stages 2C, 2D & 2E

Project Overview

Location :             Calypso Bay, Queensland
Duration :            2017
Value :                  $2.6 million
Client :                  Roche Group Pty Ltd

Project Scope

Another masterplanned community that DAC is proud to be a part of is Calypso Bay. A canal front community all about lifestyle. DAC delivered 3 stages constructed concurrently to meet client demand and also involved the supply and installation of vacuum sewer main throughout the estate.

The Major scopes included:

  • Clearing works
  • Ground stabilisation works
  • Bulk earthworks export
  • Concrete sleeper retaining walls
  • Sandstone Retaining walls
  • Roadworks and asphalt works
  • Existing stormwater upgrade
  • Vacuum Sewer reticulation
  • Water reticulation
  • Electrical / Telstra services
  • Landscaping coordination

DAC value delivered

Given the relatively low elevation of the site being a canal front, considerable thought needed to be made towards earthworks, roadworks and in particular, sewer works.

This estate involved the installation and commissioning of a new vacuum sewer line which is a specialised sewer system reserved for difficult sites. DAC in association with our subcontractors was able to deliver this vacuum system to the council standards and have it commissioned within contract timeframes.